A sleek addition to Zambelli’s half-round gutter and downpipe systems, the s-curve offers a 3” offset and adds a clean and elegant look to downpipe runs when required.
• Charcoal DIAMOND CUT Robust Matte Finish
• for 80mm downpipe
• 3-points connection, enlargement at the top, and reduction and chamfer at the bottom
• hardly visible and high-quality WIG-welding seam outside the water run
• consistent shape and exact fit