Copper S-Curve 80mm

$100.50

A sleek addition to Zambelli’s half-round gutter and downpipe systems, the s-curve offers a 3” offset and adds a clean and elegant look to downpipe runs when required.

• 99% pure copper

• for 80mm downpipe

• 3-points connection, enlargement at the top, and reduction and chamfer at the bottom

• hardly visible and high-quality WIG-welding seam outside the water run

• consistent shape and exact fit