Anthracite Coated Steel S-Curve 80mm

$61.50

 More payment options

A sleek addition to Zambelli’s half-round gutter and downpipe systems, the s-curve offers a 3” offset and adds a clean and elegant look to downpipe runs when required.

• RAL 7016 Robust Matte Finish

• for 80mm downpipe

• 3-points connection, enlargement at the top, and reduction and chamfer at the bottom

• hardly visible and high-quality WIG-welding seam outside the water run

• consistent shape and exact fit